We were recently called to a site in Mickleover, where the builder needed the ground floor repaired before finished floor coverings could go down.
The concrete had suffered severe weather damage and was up to 25mm out of level. We removed the failed surface, levelled the floor ready for LVT and completed the whole job in a single day, so the other trades could get straight back to work.
The concrete across the ground floor had suffered severe weather damage, and the surface had completely failed throughout. Instead of a sound, smooth finish, it had become rough, pitted and flaking, with loose material lifting away across the rooms.
On top of the damage, the floor was up to 25mm out of level. In this condition, it was unable to receive finished floor coverings, and the builder needed it put right before the project could move forward.
Levelling compounds can only perform properly when they are laid onto a solid, stable base. If they are applied over a weak or loose surface, the new layer has nothing firm to bond to, which can lead to cracking, hollow areas or the compound lifting away over time. That is why the failed surface had to be dealt with first, rather than simply covered over.
Because the surface had failed throughout, the entire top layer needed removing. We used grinders fitted with diamond discs and tungsten carbide copper discs, along with other grinding equipment, to take the damaged material away across the whole floor.
All of the loose surface material was removed so that we could get down to a solid substrate. This preparation stage is the foundation of a successful floor repair, as it gives the levelling compounds a sound surface to bond to and perform as they should.
With a solid substrate in place, we were tasked with levelling the floor ready for LVT (luxury vinyl tiles). Because the floor was so uneven, the levelling compound had to be installed at depths ranging from 2 to 25mm across the area.
LVT is a thin, flexible floor covering, so any dips, bumps or imperfections in the floor beneath can show through the finished surface over time. A smooth, flat base is essential to give the flooring a professional look and a long lasting finish.
Once installed, the levelling compound flowed out across the rooms and hallway to create a smooth, flat surface, ready to receive the new floor covering.
Timing was just as important as quality on this job. We completed the full repair, from removing the failed surface to installing the levelling compounds, all on the same day.
As a result, the other trades were able to get back in the following day and carry on with their work, meaning there was very little disruption to the site programme. On a busy site, keeping each stage moving is vital, and we are always happy to work around the needs of the builder and the wider project.
We work with everyone from independent builders to large construction companies, as well as commercial and domestic clients. Whether a floor needs repairing, levelling or a completely new screed, our experienced team can assess the problem and recommend the right solution to get the project back on track.
If you have a damaged or uneven floor that needs repairing before floor coverings can be laid, we can help. Based in Derbyshire, we cover the Midlands and the wider UK, and we offer free site surveys. Contact us today to discuss your project.